top of page

Placing Rock in a Foundation Before the Concrete Pad at Bear Lake, Utah

Writer: Chad Hagman
Chad Hagman
Sep 28
1 min read
Black Mountain Rock truck placing gravel into a new home foundation at Bear Lake, Utah

Black Mountain Rock delivered rock into a new foundation at Bear Lake, Utah, getting it ready for the concrete pad.

The challenge

Foundation walls make it hard to get rock where it needs to go. Dumping outside the walls means moving it all inside by hand or with equipment.

How we did it

We used the conveyor to place the rock over the foundation walls and inside the forms, so the crew could level it and move on to pouring concrete.

Need something similar?

Need rock placed inside a foundation at Bear Lake, in Cache Valley, or anywhere nearby? Call 435-890-0159 or request a quote online. We deliver across Cache Valley, Northern Utah, Southeast Idaho, and Western Wyoming.

 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page